Manufacturer Superior Quality Molds for Air Conditioning Side Outlet Decoration Frame
R404A is an HFC blend that is widely used
in low and medium temperature refrigeration applications, such as those used in
commercial refrigeration. Whilst it has become the widely accepted alternative
to CFC R502, R404A is coming under greater scrutiny due to its high Global
Warming Potential, leading to an increased focus on lower GWP alternatives such
as R407C, R417A and R422D.
High Quality R404A Gas,Mixed Refrigerant Gas R410A,R404A Refrigerant,Blend Refrigerant Gas R404A Zhejiang Jinze Refrigerant Co.,Ltd , https://www.uiszl.com
product name:Manufacturer superior quality molds for air conditioning side outlet decoration fram
Business Description
We can OEM or ODM for your new project:
Injection Plastic Mold and Mass-production parts
gas assist mold and parts
Precision machining
Transpartent  mould and parts
Auto mold and parts
Product description:
Plastic injection mould/progressive mould supplier
1.Mould material:45#, 50#, P20, H13, 718, NAK80, S136, SKD61, etc
2.Base:LKM, HASCO
3.Cavity:Single/multi
4.Runner:Hot/cold
5.Lead time:30-40days
Â
Items
Injection Plastic mold
Parts material
PC, PP, PBT, ABS, BMC, PMMA, PC+ABS, PP+TD20%, PU, PE, PVC..Etc
Mold base steel
NAK80, S136, SKD61,45, S55C, P20, 1730, 2738, 718h, H13, BPMHH, 2343ESR
Core&cavity steel
NAK80, S136, SKD61, P20,1730hh, 2738hh, 718h, H13, BPMHH, 2343hh,  etc.
Injection system
Edge gate, Slid gate,Sub gate,Direct gate, Pin point gate, Valve gate, etc.
Mould standard
DME, LKM, HASCO, ETC.
Cavity numbers
Single or Multi (Custmozied up to 32Cav.)
Runner
Hot or cold
Injection machine
100T-1500T
Cycle time
10-120 seconds
Mold of Steel Suppliers
Finkl,Assab,Daidao,LKM,Buderusetc
Hot Runners Suppliers
Synventive,Yudo,Incoe,Hasco,DME,Moldmaster,HRS,Delachaux
Mould Life
300,000 -Â 1,000,000 shots
Tooling lead time
20-40 days
Design software
Pro/E, UG, Catia, Solidwork, Moldflow, AutoCad,etc.
Mould Life
300,000 -Â 1,500,000 shots
Shipping Packing
Wooden case or according to customer's requirement
Quality assurance
GB/T19001-2008/lean management
Our Advantage:
1.Good Q\ CÂ \ DÂ for customer;
2.Over30 machines with advanced equipment from Taiwan,Japan and Swiss;
3.Strong R&D team
4.Good After-sale service
5.Practices QMS
6.High polish, no sharp, perfect surface finish
7.Low MFQ
8.Practices lean management
Design Definition Requirements
1, Mold basic info,sample;
2, Plastic components function;
3, 2D drawing(weight) or 3D drawing;
4, Quantity or technical requirements;
5, Annually forcast or MFQ;
6, Surface treatment requirements, sample is better;
7, Other keypoint;
Company Profile
YixunMold is a Dongguan-owned enterprise, founded in 1998, located in chang'an  District of Dongguan City.After 15 years of accumulated experience and continuous improvement of quality control.
Company images
Certification
Â
Q /Â A
Q.When can IÂ get the price of the product?
A.We usually quote within 24 hours after we got your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
Q.How can IÂ get the accurate price of the product?
A.Usually we will quote to you together with the mold.So plase provide the final drawing.That are:3D drawings in STP,IGS,X-T format are available.
Q.Do you accept the OEM of the product?
A.OEM is welcome.We can make mass-production the parts and assembly components for you.
Q.I have an idea for a new product, but don't know if it can be manufactured.Can you help?
A.Sorry.We cannot provide this service until now.
Q.My components have already been developed on CAD.Can you use the drawings?
A.Yes!DWG, DXF, IGES, Solidworks files can all be used to generate quotes, models and mould.
Q.What type of material is best for my design/component?
A.Materials selection depends on the application of your design and the environment in which it will function.But we can discuss the alternatives and suggest the best material for you.
Q.I've decided to go ahead with my project.How long will it take to get my parts?
A.It can take 3-8 weeks to have the mold tool manufactured depending on the part's complexity and the Cav.Qty (single or multi).We can delivery the parts within 2-3 days.After we had received final approval by your company,
Contact Us
Contact person: Veronica
Tel: 0769-81550128
Mobile: 86+13560044696
Â
Â
Â