Nantong COSCO Heavy Industry's improved folding hatch weld welding process is recognized
September 24 00:24:03, 2021
Recently, in order to reduce the time required for the cover frame to reduce the rework waste and improve the production efficiency, Nantong Zhongyuan Heavy Industry Co., Ltd. has improved the butt weld process of the folding hatch girder web and the top plate, which not only greatly saves the flap and The lifting time also reduced the repair rate of the problem from the original 25% to 0, which solved the raw materials, other auxiliary materials and waste of working hours caused by the heavy seam problem, and obtained the unanimous approval of the shipowner's ship inspection.
It is reported that for the folding hatch, Nantong COSCO Heavy Industries has modified the butt weld size of the trunk girder web and the roof panel without violating the design structure, so that even in the group production, the girder web joints The interchange of the left and right sides of the position also ensures that the splicing seam of the girders of the girders and the splicing joints of the roof are completely staggered during the assembly phase, thereby avoiding the waste of rework and the influence of the construction period caused by such re-arrangement.
Our products are widely used in various factories, civilian building, warehouse and other steel structure building.
Specifications:
Raw material
PPGI or GI
Material thickness range
0.2-0.8mm
Rollers
18 rows
Material of forming rollers
45# steel with chromed
Shaft diameter and mateiral
76mm, material is 40Cr
Material of cutting blade
Cr12 mould steel with quenched treatment
Forming speed
12-15m/min(excluding cutting stoping time)
Main motor power
4 KW
Hydraulic station power
3KW
Mode of cutting
Hydraulic cutting or flying saw cutting or mould cutting
Control system
PLC Frequency Control System with touch screen
Working process:
Decoiler - Feeding guide - Straightening - Main roll forming machine - PLC control system - Cutting - Exit rack
Pictures of machine:
Training and Installation : 1. We offer installation service local in paid, reasonable charge. 2. QT test is welcome and professional. 3. manual and using guide is optional if no visiting and no installation.
Certification and after service: 1. Match the technology standard, ISO producing certification 2. CE certification 3. 12 months warranty since the delivery. Board.
Our advantages: 1. Short delivery period. 2. Effective communication 3. Interface customized.
Square Downspipe Roll Forming Machine,Aluminum Square Downspipe Roll Forming Machine,Steel Square Downspipe Roll Forming Machine,Plc Square Downspipe Roll Forming Machine
YingYee Machinery and Technology Service Co.,Ltd , https://www.yingyee.cn